Automatic insertion of wait labels

Before the insertion of wait labels, the operations must be reordered in the sequencing mode if the project contains more than one part.

Any operation can have the parameter “wait other channel” on the Links/Leads page. This parameter is visible only if the previous operation in the reordered sequence works in the other channel.

If the Wait other channel is enabled, the <Wait> CLData command is automatically inserted. So, the current operation will not start until the previous operation is finished.

images/download/attachments/128537448/image2024-7-17_17-9-33.png


Another method for the automatic insert of the wait labels is using the Turn take over operation. It can be synchronized with the part-off operation.

images/download/attachments/128537448/image2024-7-17_17-11-34.png